Aug 25, 2016
Client: GAMESA INNOVATION & TECHNOLOGY Location: OVENDEN, UK Date: 2016 Customised design and supply of 9 FÖHN+SONORA LT unit systems and low-temperature adaptation auxiliary systems for the protection of the nacelle and electrical cabinet in GAMESA G8X...
Aug 25, 2016
Client: GEOLICA Location: LA MUELA, SPAIN Date: 2015 Development and application of the MELTEMI WIRE solution for the protection of cable harnesses for the tower in 56 turbines of several...
Aug 25, 2016
Client: GAMESA INNOVATION & TECHNOLOGY Location: INDIA, BRAZIL, EUROPE Date: 2013-2016 Integration of the OrWind Meltemi Basic-T system into several platforms (G8X, G9X, G114 STD1, G114 STD2, G114 2.5, G132 3.3) for their in-plant installation in any...
Aug 25, 2016
Client: GAMESA INNOVATION & TECHNOLOGY Location: AGREDA PRODUCTION PLANT, SPAIN Date: 2013 Design and adaptation of the OrWind Meltemi Basic-T system and of line assembly procedures to be applied by Gamesa on the G9X platform in the production...
Aug 25, 2016
Client: SUZLON WIND ENERGY Location: SEVERAL WIND FARMS Date: 2012 Risk-analysis assessment and design of a fire protection system based on the customisation of OrWind Föhn and Xaloc...