+ 34 976 50 44 64 oasys@oasysgp.com

POWEREXPO 11

  • Client: ASEA BROWN BOVERI
  • Location: POWEREXPO, ESPAÑA
  • Date: 2011

Design, customisation and assembly of the OrWind Föhn prototype in an electrical cabinet to be presented jointly with ABB at the Wind Power Expo 2011.